The illuminated entry system controls the power switch illumination.
Before replacing the certification ECU (smart key ECU assembly), refer to Service Bulletin.
Connect the GTS to the DLC3.
Turn the power switch on (IG).
Turn the GTS on.
Enter the following menus: Body Electrical / Entry&Start / Active Test.
Perform the Active Test according to the display on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| Power/Engine SW Light | Power switch illumination | OFF or ON | - |
| Tester Display |
|---|
| Power/Engine SW Light |
Power switch illumination comes on.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the power switch.
Click hereEngine / Hybrid System>A25A-FXS (STARTING)>POWER SWITCH>REMOVAL
Inspect the power switch.
Click hereEngine / Hybrid System>A25A-FXS (STARTING)>POWER SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the K62 certification ECU (smart key ECU assembly) connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| K63-9 (SWIL) - K62-10 (SWIL) | Always | Below 1 Ω |
| K63-6 (AGND) - K62-11 (AGND) | Always | Below 1 Ω |
| K63-9 (SWIL) or K62-10 (SWIL) - Body ground | Always | 10 kΩ or higher |
| K63-6 (AGND) or K62-11 (AGND) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG