Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
75561A
1.INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP
When installing new roof drip side finish moulding clips, remove any double-sided tape remaining where the roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
| *a | Adhesive |
| *b | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to each new roof drip side finish moulding clip.
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1987 psi) or more (when the temperature is 23°C (73°F).)
Install the 2 roof drip side finish moulding clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips.
| Area | Measurement | Area | Measurement |
|---|---|---|---|
| A | 4.5 to 5.5 mm (0.177 to 0.217 in.) | B | 3.6 mm (0.142 in.) |
| C | 1.7 to 2.7 mm (0.0669 to 0.106 in.) | D | 5.0 mm (0.197 in.) |
| E | 4.5 to 5.5 mm (0.177 to 0.217 in.) | F | 2.3 to 3.3 mm (0.0906 to 0.130 in.) |
| G | 2.1 mm (0.0827 in.) | - | - |
Wait at least 40 minutes before installing the roof drip side finish moulding.
Initial hardening time: 40 minutes
Complete hardening time: 24 hours
75552H
2.INSTALL ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips to install the roof drip side finish moulding as shown in the illustration.
| Area | Measurement | Area | Measurement |
|---|---|---|---|
| A | 0.8 mm (0.0315 in.) | B | 6.2 mm (0.244 in.) |