1.INSTALL SST AND DIAL INDICATOR
Remove the plug bolt and gasket from the distributive head plug of the injection pump.
Install SST (plunger stroke measuring tool) and a dial indicator to the plug bolt hole of distributive head plug.
2.RELEASE ACSD ADVANCE (w/ ACSD)
Using a screwdriver, turn the cold starting lever counterclockwise approx. 20°.
Put a metal plate (thickness of 8 - 10 mm (0.315 - 0.394 in.) between the cold starting lever and thermowax plunger.
3.SET NO.1 OR NO.6 CYLINDER TO TDC/COMPRESSION
Turn the crankshaft pulley clockwise, and align its groove with the timing gear cover groove.
4.ADJUST INJECTION TIMING
Slowly rotate the crankshaft pulley counterclockwise and set the dial indicator at 0 mm (0 in.) when the dial indicator reaches the minimum value.
Compared with previous 4 cylinder engines the 0 mm (0 in.) position (crank angle) is reduced, so perfrom the operation carefully.
Turn the crankshaft to the left and right and check that the dial indicator shows the minimum value.
Slowly rotate the crankshaft pulley clockwise until pulley groove is aligned with timing gear cover groove.
Measure the plunger stroke.
1.03 - 1.09 mm (0.0406 - 0.0429 in.)
Repeat steps (a) to (d) several times.
Loosen these nuts and bolt:
6 union nuts of injection pipes at injection pump side
Bolt holoing injection pump to injection pump stay
2 nuts holding injection pump to timing gear case
Adjust plunger stroke by slightly tilting the injection pump body.
If the stroke is less than specification, tilt the pump toward the engine.
If the stroke is greater than specification, tilt the pump away from the engine.
Tighten these nuts and bolt:
2 nuts holding injection pump to timing gear case
18 N*m (185 kgf*cm, 13 ft*lbf)
Bolt holding injection pump to injection pump stay
69 N*m (700 kgf*cm, 61 ft*lbf)
Recheck the plunger stroke.
5.REMOVE MENTAL PLATE (w/ ACSD)
6.REMOVE SST AND DIAL INDICATOR
Remove the SST and dial indicator.
Install a new gasket and the plug bolt of the distributive head plug.
17 N*m (170 kgf*cm, 12 ft*lbf)
7. TORQUE UNION NUTS OF INJECTION PIPES
17 N*m (170 kgf*cm, 12 ft*lbf)
8. START ENGINE AND CHECK FOR LEAKAGE