Home › Engine / Hybrid System › 1HZ (ENGINE MECHANICAL) › TIMING GEARS
RM2850E _51 Engine / Hybrid System _073150 1HZ ENGINE MECHANICAL _0355946 TIMING GEARS G

1HZ ENGINE MECHANICAL  TIMING GEARS  INSPECTION  


PROCEDURE

Hide 13525 1.INSPECT IDLE GEAR

a.
A422701

Using a cylinder gauge, measure the inside diameter of the idler gear.

Idler gear inside diameter:

45.000 - 45.025 mm (1.7717 - 1.7726 in.)



b.
A422702

Using a micrometer, measure the diameter of the idler gear shaft.

Idler gear shaft diameter:

44.950 - 44.975 mm (1.7697 - 1.7707 in.)



c.

Subtract the idler gear shaft diameter measurement from the idler gear inside diameter measurement.

Standard oil clearance:

0.025 - 0.075 mm (0.0010 - 0.0030 in.)


Maximum oil clearance:

0.20 mm (0.0079 in.)


If the clearance is greater than maximum, replace the gear and shaft.


Hide 2.INSPECT INJECTION PUMP DRIVE GEAR BEARING

a.
A422703

Check that bearing is not rough or worn.


Hide 3.IF NECESSARY, REPLACE INJECTION PUMP DRIVE GEAR BEARING

a.
A422704

Remove bearing

Using SST, remove the bearing.


b.
A422705

Install bearing

Using SST and a press, press in a new bearing.

SST
09214-76011  


Hide 4.CHECK BACKLASH OF TIMING GEARS

a.

Using a dial indicator, measure the backlash.

Standard gear backlash:

0.05 - 0.15 mm (0.0020 - 0.0060 in.)


Maximum gear backlash:

0.30 mm (0.0118 in.)


If the gear backlash is greater than maximum, replace the gears as a set.

A422706