1.INSTALL CONDITIONS
Engine at normal operating temperature
Air cleaner installed
All accessories switched OFF
All vacuum lines properly connected
Valve clearance set correctly
Injection timing set correctly
w/ PS Idle-Up System:
Steering wheel at straight-ahead position
2.CONNECT TACHOMETER
3.INSPECT AND ADJUST IDLE SPEED
Check that the adjusting lever touches the idle speed adjusting screw when the accelerator pedal is released.
If not, adjust the accelerator linkage.
Start the engine.
Check the idle speed.
600 - 700 rpm
750 - 850 rpm
600 - 700 rpm
700 - 750 rpm
Adjust the idle speed.
Disconnect the accelerator linkage.
Loosen the lock nut of the idle speed adjusting screw.
Adjust the idle speed by turning the idle speed adjusting screw.
Securely tighten the lock nut, and recheck the idle speed.
Reconnect the accelerator linkage.
After adjustment, adjust the accelerator linkage.
4.CHECK MAXIMUM SPEED
Check that the adjusting lever touches the maximum speed adjusting screw when the accelerator pedal is depressed all the way.
If not, adjust the accelerator linkage.
Start the engine.
Depress the accelerator pedal all the way.
Check the maximum speed.
4,050 - 4,200 rpm
4,050 - 4,250 rpm
3,900 - 4,100 rpm
Adjust the idle speed.
Disconnect the accelerator linkage.
Cut off the seal wire of the maximum speed adjusting screw.
w/ HAC, 15B-FT:
Using SST, loosen the lock nut of the maximum speed adjusting screw.
Others:
Loosen the lock nut of the maximum speed adjusting screw.
Adjust the maximum speed by turning the maximum speed adjusting screw.
Adjust at idle speed. Then, raise engine speed and recheck the maximum speed.
w/ HAC, 15B-FT:
Using SST, securely tighten the lock nut.
Others:
Securely tighten the lock nut.
Recheck the maximum speed.
Reconnect the accelerator linkage.
After adjustment, adjust the accelerator linkage.
Seal the maximum speed adjusting screw with a new seal wire.