Home › Engine / Hybrid System › 14B (LUBRICATION) › ENGINE OIL COOLER › 2017.01–2019.08
RM2850E _51 Engine / Hybrid System _073172 14B LUBRICATION _0356064 ENGINE OIL COOLER A

14B LUBRICATION  ENGINE OIL COOLER  OIL COOLER INSTALLATION  


PROCEDURE

Hide 1.INSTALL OIL COOLER TO OIL COOLER COVER

a.
A424294

Install 2 new gaskets and the oil cooler to the oil cooler cover with the 4 nuts.

Torque:

16 N*m (163 kgf*cm, 12 ft.*lbf)



Hide 2.INSTALL OIL COOLER AND COVER ASSEMBLY

a.
A424295

Install a new gasket, the oil cooler and cover assembly with the 8 bolts and 3 nuts. Uniformly tighten the bolts and nuts in several passes.

Torque:

21 N*m (214 kgf*cm, 15 ft.*lbf)



b.

Using a 6 mm wrench, install the washer and bolt.

Torque:

21 N*m (214 kgf*cm, 15 ft.*lbf)



Hide 3.INSTALL STUD BOLT FOR EXHAUST MANIFOLD (3B, 14B, 15B-F)

Torque:

47 N*m (480 kgf*cm, 35 ft.*lbf)


Hide 4.INSTALL BOLTS HOLDING ACTUATOR TO TURBOCHARGER (15B-FT)

Torque:

21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 15609 5.INSTALL OIL FILTER BRACKET

a.
A424296

Install a new gasket and the oil filter with the 4 (3B, 14B, 15B-F) or 3 (15B-FT) bolts.

Torque:

44 N*m (449 kgf*cm, 32 ft.*lbf)


HINT:

Each bolt length is indicated in the illustration.


Bolt length:

A 75 mm (2.95 in.)

B 70 mm (2.76 in.)

C 55 mm (2.17 in.)

D 35 mm (1.38 in.)



Hide 6.INSTALL RELIEF VALVE

a.

Install the relief valve and spring with a new gasket and the relief valve.

Torque:

49 N*m (500 kgf*cm, 36 ft.*lbf)



Hide 7.INSTALL TURBOCHARGER STAY AND TURBO OIL PIPE (15B-FT)

Hide 9. FILL WITH ENGINE COOLANT

Hide 10. START ENGINE AND CHECK FOR LEAKS

Hide 11.CHECK ENGINE OIL LEVEL