1.INSTALL OIL COOLER TO OIL COOLER COVER
Install 2 new gaskets and the oil cooler to the oil cooler cover with the 4 nuts.
16 N*m (163 kgf*cm, 12 ft.*lbf)
2.INSTALL OIL COOLER AND COVER ASSEMBLY
Install a new gasket, the oil cooler and cover assembly with the 8 bolts and 3 nuts. Uniformly tighten the bolts and nuts in several passes.
21 N*m (214 kgf*cm, 15 ft.*lbf)
Using a 6 mm wrench, install the washer and bolt.
21 N*m (214 kgf*cm, 15 ft.*lbf)
3.INSTALL STUD BOLT FOR EXHAUST MANIFOLD (3B, 14B, 15B-F)
47 N*m (480 kgf*cm, 35 ft.*lbf)
4.INSTALL BOLTS HOLDING ACTUATOR TO TURBOCHARGER (15B-FT)
21 N*m (214 kgf*cm, 15 ft.*lbf)
15609
5.INSTALL OIL FILTER BRACKET
Install a new gasket and the oil filter with the 4 (3B, 14B, 15B-F) or 3 (15B-FT) bolts.
44 N*m (449 kgf*cm, 32 ft.*lbf)
Each bolt length is indicated in the illustration.
A 75 mm (2.95 in.)
B 70 mm (2.76 in.)
C 55 mm (2.17 in.)
D 35 mm (1.38 in.)
6.INSTALL RELIEF VALVE
Install the relief valve and spring with a new gasket and the relief valve.
49 N*m (500 kgf*cm, 36 ft.*lbf)
7.INSTALL TURBOCHARGER STAY AND TURBO OIL PIPE (15B-FT)
8.INSTALL OIL FILTER
9. FILL WITH ENGINE COOLANT
10. START ENGINE AND CHECK FOR LEAKS
11.CHECK ENGINE OIL LEVEL