Home › Engine / Hybrid System › 1BZ-FPE (COOLING) › RADIATOR › 2017.01–2021.01
RM2850E _51 Engine / Hybrid System _073203 1BZ-FPE COOLING _0356272 RADIATOR G

1BZ-FPE COOLING  RADIATOR  ON-VEHICLE INSPECTION  


PROCEDURE

Hide 1.INSPECT FINS FOR BLOCKAGE

a.
A422118

If fins are clogged, wash them with water or a steam cleaner and dry with compressed air.

NOTICE:
·

If the distance between the steam cleaner and the core is too close, there is a possibility of damaging the fin, so keep the following injection distance.

Injection Pressure Injection Distance
2,942 - 4,903 kpa (30 - 50 kg/cm2, 427 - 711 psi) 300 mm (11.811 in)
4,903 - 7,845 kpa (50 - 80 kg/cm2, 711 - 1,138 psi) 500 mm (19.685 in)

·

If the fins are bent, straighten them with a screwdriver or pliers.

·

Never apply water directly onto the electronic components.