1.INSTALL STATOR
Install the stator with 3 bolts.
8 N*m (80 kgf*cm, 69 in.*lbf)
Using SST, install the new snap ring.
SST 07112-84020
Connect the stator lead wire to the compressor housing.
2.INSTALL ROTOR
Install the rotor on the compressor shaft.
Using SST, install the new snap ring.
SST 07114-84020
3.INSTALL PRESSURE PLATE
Adjust the clearance between the pressure plate and rotor by putting shims on the compressor shaft.
0.4 - 0.7 mm (0.016 - 0.028 in.)
If the clearance is not within tolerance, add or reduce the number of shims to obtain the standard clearance.
Using SST and torque wrench, install the shaft nut.
SST 07110-67010
16 N*m (165 kgf*cm, 12 ft.*lbf)
4. CHECK CLEARANCE OF MAGNETIC CLUTCH
Set the dial indicator to the pressure place of the magnetic clutch.
Connect the magnetic clutch lead wire to the positive (+) terminal of the battery.
Check the clearance between the pressure plates and rotor, when connect the negative (-) terminal of the battery.
0.4 - 0.7 mm (0.016 - 0.028 in.)
If the clearance is not within standard clearance, adjust the clearance using shims to obtain the standard clearance.