Home › Brake › BRAKE SYSTEM (OTHER) › VACUUM PUMP (for 14B) › 2017.01–2019.08
RM2850E _54 Brake _073226 BRAKE SYSTEM (OTHER) _0356441 VACUUM PUMP(for 14B) A

BRAKE SYSTEM (OTHER)  VACUUM PUMP(for 14B)  REASSEMBLY  


PROCEDURE

Hide 1.INSTALL BEARING TO ROTOR SHAFT

C397340

Using a press, install a new bearing to the rotor shaft.

Hide 2.INSTALL ROTOR SHAFT

C397341

Using SST and a press, install the rotor shaft to the casing.

SST
09608-30012  

Hide 3.INSTALL SNAP RING

C397334

Using snap ring pliers, install the snap ring.

Hide 4.INSTALL ROTOR INTO CASING

C397342

Apply engine oil to the rotor and install it to the rotor shaft.

Hide 5.INSTALL 4 BLADES

a.

Apply engine oil to the blades.


b.

Install the 4 blades with the round end facing outward.


c.

Be sure that the blades and rotor surfaces are even.


Hide 6.INSTALL END COVER

a.
C397331

Place the vacuum pump on vise, as shown in the illustration.

NOTICE:

Do not tighten the vise.



b.

Install 2 new O-rings.


c.

Install the end cover in place and temporarily install the 3 bolts.


d.

Using a pin punch and hammer, drive in the 2 straight pins.


e.
C397330

Using soft jaws on the vise, place the vacuum pump in the vise.

NOTICE:

Do not tighten the vise too tightly.



f.

Tighten the 3 bolts.

Torque:

7.8 N*m (80 kgf*cm, 69 in.*lbf)



Hide 7.INSTALL CHECK VALVE

C397329

Install the check valve with a new gasket.

Torque:

74 N*m (755 kgf*cm, 55 ft.*lbf)


Hide 8.INSTALL VACUUM HOSE UNION

C397328

Install the vacuum hose union with 2 new gaskets, and install and torque the union bolt.

Torque:

14 N*m (143 kgf*cm, 10 ft.*lbf)


HINT:

Align and insert the union pin into the matching hole of the casing.


Hide 9.INSTALL GEAR

C397343

a.

Temporarily install the woodruff key, gear and lock nut to the pump.


b.

Using soft jaws on the vise, clamp the gear in the vise.


c.

Tighten the gear lock nut.

Torque:

110 N*m (1,122kgf*cm, 81 ft.*lbf)