1.INSTALL LOAD SENSING SPRING BUSH AND BOOT KIT
Apply lithium soap base glycol grease to the parts shown in the illustration.
|
Lithium soap base glycol grease |
Install a new load sensing valve boot and a new load sensing spring boot to the load sensing spring.
Install 2 new No. 1 load sensing spring bushes, 2 new No. 2 load sensing spring bushes, 2 new plate washers and 2 collars to the load sensing valve boot and load sensing spring boot.
Temporarily install the nut, plate washer, No. 1 load sensing spring shackle and lock nut to the No. 2 load sensing spring shackle.
Install the 2 load sensing valve bushes and collar to the No. 2 load sensing spring shackle.
Temporarily install the 2 plate washers and No. 1 load sensing spring shackle with the nut, washer and bolt.
Tighten the nut while holding the bolt.
18 N*m (184 kgf*cm, 13 ft.*lbf)
Turn the lock nut so that dimension A, shown in the illustration, is adjusted to approximately 90 mm (3.54 in.).
12.5 N*m (127 kgf*cm, 9 ft.*lbf)
| *1 | Lock Nut |
Install the No. 1 load sensing shackle bracket to the No. 2 load sensing spring shackle with the plate washer and nut.
12.5 N*m (127 kgf*cm, 9 ft.*lbf)
2.INSTALL LOAD SENSING PROPORTIONING VALVE
Install the load sensing proportioning valve to the load sensing valve boot with the clip.
Temporarily install the load sensing proportioning valve and 2 plate washers to the load sensing valve bracket.
Temporarily install the load sensing valve set plate, 2 washers and 2 nuts.
Temporarily install the bolt, washer and nut.
Tighten the nut while holding the bolt.
18 N*m (184 kgf*cm, 13 ft.*lbf)
Tighten the 2 nuts.
12.5 N*m (127 kgf*cm, 9 ft.*lbf)