11101J
1.INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
Measure the resistance between the terminals.
6.9 to 7.9 Ω at 20°C (68°F)
If the result is not as specified, replace the oil control valve.
Connect the positive (+) battery lead to terminal 1 and negative (-) lead to terminal 2, and check the movement of the valve.
| Condition | Specified Condition |
|---|---|
| Battery positive (+) voltage is applied | Valve moves to left as indicated by the arrow |
| Battery positive (+) voltage is cut off | Valve moves to right as indicated by the arrow |
If the result is not as specified, replace the oil control valve.
If the valve cannot return properly because of foreign matter, a small pressure leak in the advanced direction may occur and a DTC may be output.