Home › Engine / Hybrid System › 1BZ-FPE (CHARGING) › GENERATOR › 2017.01–2021.01
RM2850E _51 Engine / Hybrid System _073311 1BZ-FPE CHARGING _0357074 GENERATOR A

1BZ-FPE CHARGING  GENERATOR  DISASSEMBLY  


PROCEDURE

Hide 1.REMOVE REAR END COVER

a.
A422133

Remove the nut and terminal insulator.


b.
A422134

Remove the 3 nuts, and rear end cover sub-assy.


c.
A422135

Remove the 2 nuts, bolt, terminal plate and rear end cover.


Hide 2.REMOVE BRUSH HOLDER AND IC REGULATOR

a.
A422136

Remove the brush holder cover from the brush holder.


b.
A422137

Remove the 5 screws, brush holder and IC regulator.


c.
A422138

Remove the seal plate from the rectifier end frame.


Hide 27357 3.REMOVE RECTIFIER HOLDER

a.
A422139

Remove the 4 screws and rectifier holder.


b.
A422140

Remove the 4 rubber insulators.


Hide 27411 4.REMOVE PULLEY

a.
A422141

Hold SST (A) with a torque wrench, and tighten SST (B) clockwise to the specified torque.

SST
09820-63011  

Torque:

39 N*m (400 kgf*cm, 29 ft*lbf)



b.

Check that SST (A) is secured to the rotor shaft.


c.
A422142

As shown in the illustration, mount SST (C) in a vise, and install the alternator to SST (C).


d.

To loosen the pulley nut, turn SST (A) in the direction shown in the illustration.

NOTICE:

To prevent damage to the rotor shaft, do not loosen the pulley nut more than one-half of a turn.



e.

Remove the alternator from SST (C).


f.

Turn SST (B), and remove SST (A and B).


g.

Remove the pulley nut and pulley.


Hide 5.REMOVE RECTIFIER END FRAME

a.
A422143

Remove the 4 nuts and cord clip.


b.
A422144

Using SST, remove the rectifier end frame.

SST
09286-46011  


c.
A422145

Remove the alternator washer.


Hide 27330 6.REMOVE ROTOR FROM DRIVE END FRAME

A422146