1.SET NO. 1 OR NO. 4 CYLINDER TO 35 - 62° BTDC/COMPRESSION
Turn the crankshaft pulley clockwise so the pulley groove is 35 - 62° or more from the groove of the timing gear cover.
2.LOOSEN BOLTS HOLDING INJECTION PUMP STAY TO INJECTION PUMP
Loosen the 2 bolts.
3.INSTALL SST AND DIAL INDICATOR
Remove the plug bolt and gasket from the distributive head plug of the injection pump.
Install SST (plunger stroke measuring tool) and a dial indicator to the plug bolt hole of distributive head plug.
4.RELEASE ACSD ADVANCE
Using a screwdriver, turn the cold starting lever counterclockwise approx. 20°.
Put a metal plate (thickness of 8.5 - 10.0 mm (0.335 - 0.394 in.)) between the cold starting lever and thermo wax plunger.
5.INSPECT AND ADJUST INJECTION TIMING
Slowly rotate the crankshaft pulley counterclockwise and set the dial indicator at 0 mm (0 in.) when the dial indicator reaches the minimum value.
Turn the crankshaft to the left and right and check that the dial indicator shows the minimum value.
Check that the minimum value is set at 0 mm (0 in.)
Slowly rotate the crankshaft pulley clockwise until its groove is aligned with the groove of the timing gear cover.
Measure the plunger stroke.
1.23 - 1.29 mm (0.0484 - 0.0508 in.)
1.31 - 1.37 mm (0.0516 - 0.0539 in.)
0.67 - 0.73 mm (0.0264 - 0.0287 in.)
0.87 - 0.93 mm (0.0343 - 0.0366 in.)
Loosen these nuts and bolts:
4 union nuts holding injection pipes to injection pump
2 nuts holding injection pump to timing gear case
Do not turn the nuts more than 90°.
Adjust plunger stroke by slightly tilting the injection pump body.
If the stroke is less than specification, tilt the pump toward the engine.
If the stroke is greater than specification, tilt the pump away from the engine.
Tighten these nuts and bolts:
2 nuts holding injection pump to timing gear case
4 bolts holding injection pipes to injection pump
Recheck the plunger stroke.
6.REMOVE METAL PLATE
7.REMOVE SST AND DIAL INDICATOR
Remove the SST and dial indicator.
Install a new gasket and the plug bolt of the distributive head plug.
8.TIGHTEN INJECTION PUMP STAY BOLTS
29 N*m (300 kgf*cm, 21 ft.*lbf)
9.START ENGINE AND CHECK FOR FUEL LEAKS