27310B
1.INSTALL GENERATOR DRIVE END FRAME BEARING
Using SST and a press, press in a new generator drive end frame bearing.
27312
2.INSTALL RETAINER PLATE
Align the claws of the bearing retainer with the grooves inside the drive end frame.
| *a | Claw |
Install the retainer plate with the 4 screws.
2.3 N*m (23 kgf*cm, 20 in.*lbf)
27330
3.INSTALL GENERATOR ROTOR ASSEMBLY
Install the generator rotor assembly to the generator drive end frame.
Do not drop the generator rotor assembly.
27384
4.INSTALL WASHER
Install a new washer.
27360
5.INSTALL GENERATOR COIL ASSEMBLY
Using a deep socket wrench (21 mm) and a press, slowly press in the generator coil assembly.
| *a | 21 mm Deep Socket Wrench |
Install the generator coil assembly with the 4 through bolts.
5.9 N*m (60 kgf*cm, 52 in.*lbf)
27370
6.INSTALL GENERATOR BRUSH HOLDER ASSEMBLY
While pushing the 2 brushes into the generator brush holder assembly, insert a 1.0 mm (0.0394 in.) pin into the brush holder hole.
| *a | Pin |
Install the generator brush holder assembly with the 2 screws.
1.8 N*m (18 kgf*cm, 16 in.*lbf)
Pull out the pin from the generator brush holder assembly.
| *a | Pin |
27387
7.INSTALL TERMINAL INSULATOR
Install the terminal insulator.
Be sure to install the terminal insulator in the correct direction.
27039
8.INSTALL REAR GENERATOR END COVER
Install the rear generator end cover with the 3 nuts.
4.6 N*m (46 kgf*cm, 40 in.*lbf)
27411
9.INSTALL GENERATOR PULLEY
Temporarily install the generator pulley by hand.
Mount the generator assembly in a vise between aluminum plates.
Install SST 1-A to the generator pulley shaft.
| Item | Part No. |
| SST 1-A and SST 1-B | 09820-06010 |
Install SST 1-B to SST 1-A.
Hold SST 1-A with a torque wrench and turn SST 1-B clockwise with the specified torque.
39 N*m (398 kgf*cm, 29 ft.*lbf)
Make sure that SST is secured to the generator rotor shaft.
| *a | Hold |
| *b | Turn |
Insert SST 2 and attach it to the generator pulley nut.
| Item | Part No. |
| SST 2 | 09820-06021 |
| *a | Insert |
Tighten the generator pulley nut by turning SST 1- A in the direction shown in the illustration.
132.5 N*m (1351 kgf*cm, 98 ft.*lbf)
| *a | Hold |
| *b | Turn |
Remove SST 2 from the generator assembly.
Turn SST 1-B in the direction shown in the illustration and remove SST 1-A and B.
Turn the generator pulley and check that the generator pulley moves smoothly.
| *a | Hold |
| *b | Turn |