2011-2016 FJ Cruiser · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2012 Nov 2012 – Jul 2014 from Aug 2014


1. INSTALL FUEL INJECTOR

A075654E06
  1. Install a new insulator onto each fuel injector.

  1. Apply a light coat of spindle oil or gasoline to a new O-ring and install it onto each fuel injector.

  1. A075655E04
    While turning the fuel injector left and right, install it onto the fuel delivery pipe.

  1. Position the fuel injector connector facing outward.


2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

A075656E03
  1. Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.

  1. Provisionally install the 6 bolts, which are used to hold the fuel delivery pipe, onto the intake manifold.

  1. Check that the fuel injectors rotate smoothly.

    HINT:
    If the fuel injectors do not rotate smoothly, replace the O-ring.

  1. Position each fuel injector connector facing outward.

  1. Tighten the 6 bolts, which are used to hold the fuel delivery pipe, to the intake manifold.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

  1. Connect the 6 fuel injector connectors.


3. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY
  1. Push the tube connector into the pipe until the tube connector makes a "click" sound.

    NOTICE:
    1. Check if there is any damage or foreign objects on the connected part of the fuel pipe.
    2. After connecting, check that the pipe and connector are securely connected by pulling them.

  1. Install the fuel pipe clamp.


4. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
  1. Push the tube connector into the pipe until the tube connector makes a "click" sound.

    NOTICE:
    1. Check if there is any damage or foreign matter on the connected part of the fuel pipe.
    2. After connecting, check that the pipe and connector are securely connected by pulling them.

  1. Install the fuel pipe clamp.


5. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket onto the intake air surge tank.

  1. A075648
    Using a socket hexagon wrench 8, install the intake air surge tank with the 4 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Install the 2 nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. A075646E01
    Install the 3 wire harness clamps and hose clamp.

  1. Connect the throttle body with motor connector.

  1. Connect the 2 VSV connectors.

  1. A075645
    Connect the ventilation hose.

  1. A126449
    Connect the fuel vapor feed hose.

  1. A126395
    Connect the 2 water by-pass hoses.


6. INSTALL NO. 2 SURGE TANK STAY

  1. A126391
    Install the No. 2 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


7. INSTALL NO. 1 SURGE TANK STAY

  1. A126389
    Install the No. 1 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


8. INSTALL OIL BAFFLE PLATE

  1. A126390
    Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


9. INSTALL THROTTLE BODY BRACKET

  1. A126392
    Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


10. INSTALL AIR CLEANER ASSEMBLY

  1. A075596E01
    Install the air cleaner onto the throttle body.

  1. Connect the air cleaner hose to the air cleaner.

  1. Install the air cleaner with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A075595E01
    Connect the mass air flow meter connector.

  1. Engage the 2 wire harness clamps.

  1. Connect the vacuum hose.

  1. A075594E01
    Connect the No. 2 ventilation hose.


11. ADD ENGINE COOLANT
  1. Pour coolant into the radiator until it overflows.

    Capacity:
    Transmission
    Capacity
    Manual Transmission
    9.4 liters (9.9 Us qts, 8.3 Imp. qts)
    Automatic Transmission
    9.8 liters (10.4 Us qts, 8.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    1. Use of improper coolants may damage the engine cooling system.
    2. Use only TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, and non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    3. New TOYOTA vehicles are filled with TOYOTA SLLC (color is pink, premixed ethylene glycol concentration is approximately 50 % and freezing temperature is -35°C (-31°F)). When replacing the coolant, TOYOTA SLLC is recommended.

  1. Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.

  1. Install the radiator cap securely.

  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Warm up the engine until the cooling fan operates.

    1. Set the air conditioning as follows while warming up the engine.

      Item
      Condition
      Fan Speed
      Any setting except OFF
      Temperature
      Toward WARM
      Air Conditioning Switch
      OFF

    2. Maintain the engine speed at 2,000 to 2,500 rpm and warm up the engine until the cooling fan operates.

      NOTICE:
      1. Make sure that the radiator reservoir still has some coolant in it.
      2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
      3. If there is not enough coolant, the engine may burn out or overheat.

  1. Squeeze the inlet and outlet radiator hoses several times by hand while warming up the engine to bleed the air.

    CAUTION:
    When pressing the radiator hoses:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine and wait until the coolant cools down.

  1. Remove the radiator cap and check the coolant level inside the radiator.

  1. If the coolant level is below the full level, repeat the operation until the coolant level remains at the full level.

  1. Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.


12. INSPCET FOR ENGINE COOLANT LEAK
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Pump it to 177 kPa (1.8 kgf/cm2 25.7 psi), then check for leakage.


13. INSPECT FOR FUEL LEAK
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch ON.

    NOTICE:
    Do not start the engine.

  1. Turn the Techstream ON.

  1. Select the following menu items: Powertrain / Engine and ECT / Active Test / Activate the Fuel Pump Speed Control / ON.

  1. Check that there is no leakage from the fuel system.


14. INSTALL V-BANK COVER

  1. A126475
    Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (from Aug 2014)INSTALLATION (Aug 2009 – Oct 2012) →