2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. DISCONNECT L

2. REMOVE V-BANK COVER

A126474
  1. Remove the 2 nuts, then remove the V-bank cover.


3. REMOVE MASS AIR FLOW METER

G036119E01
  1. Disconnect the connector.

  1. Remove the 2 screws, then remove the mass air flow meter.

← ON-VEHICLE INSPECTION (from Aug 2009)REMOVAL (from Aug 2009) →