2011-2016 FJ Cruiser · Service Manual DRIVE LINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. INSTALL REAR DIFFERENTIAL CARRIER ASSEMBLY
  1. Remove any dust and oil from the differential carrier assembly and the contact surfaces of the axle housing.

  1. Apply liquid gasket to both sides of a new gasket.

    NOTICE:
    Do not apply the liquid gasket to the stud bolt.

  1. Install a new gasket and the differential carrier assembly with the 10 nuts and 10 washers.

    Torque:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }


2. INSTALL REAR AXLE SHAFT LH
  1. Install the rear axle shaft LH (Click here).


3. INSTALL REAR AXLE SHAFT RH

HINT:
Use the same procedure as for the LH side.


4. INSTALL REAR PROPELLER SHAFT ASSEMBLY
  1. Install the rear propeller shaft assembly (Click here).

← INSTALLATION (Jul 2007 – Jul 2009)COMPONENTS (Jul 2007 – Jul 2009) →