Install the clutch master cylinder with the 2 bolts.
Torque:
12 N*m{
120 kgf*cm
, 9 ft.*lbf
}
Apply MP grease to the pin.
Install the push rod clevis with the pin and clip.
Using a union nut wrench, connect the clutch master cylinder to 2 way tube.
Torque:
without union nut wrench:
15 N*m{
155 kgf*cm
, 11 ft.*lbf
}
with union nut wrench:
14 N*m{
144 kgf*cm
, 10 ft.*lbf
}
NOTICE:
This torque value can be obtained by using a torque wrench with a fulcrum length of 300 mm (11.8 in.) and a union nut wrench with a fulcrum length of 22 mm (0.886 in.) (Click here).
This torque value is effective when union nut wrench is parallel to a torque wrench.
Connect the clutch reservoir tube.
2.
INSTALL CLUTCH PEDAL WITH CLUTCH MASTER CYLINDER
Install the clutch pedal with clutch master cylinder onto the vehicle with the 2 nuts and bolt.
Torque:
14 N*m{
145 kgf*cm
, 10 ft.*lbf
}
for nut
18 N*m{
184 kgf*cm
, 13 ft.*lbf
}
for bolt
Connect the clutch switch connector.
3.
INSTALL DRIVER SIDE JUNCTION BLOCK
Install the main body ECU with the 2 nuts.
Torque:
8.4 N*m{
86 kgf*cm
, 74 in.*lbf
}
4.
INSTALL INSTRUMENT PANEL LOWER LH
Install the lower instrument panel with the 4 <F> bolts.
Engage the 4 clips and 2 claws and install the instrument panel register.
7.
INSTALL COWL SIDE TRIM BOARD LH
HINT:
Use the same procedure as for the RH side.
8.
INSTALL FRONT DOOR SCUFF PLATE LH
HINT:
Use the same procedure as for the RH side.
9.
INSTALL FRONT FLOOR FOOTREST
Engage the 2 studs and install the front floor footrest.
10.
CONNECT CLUTCH MASTER CYLINDER TO FLEXIBLE HOSE TUBE
Using a union nut wrench, connect the flexible hose tube.
Torque:
without union nut wrench:
15 N*m{
155 kgf*cm
, 11 ft.*lbf
}
with union nut wrench:
14 N*m{
144 kgf*cm
, 10 ft.*lbf
}
NOTICE:
This torque value can be obtained by using a torque wrench with a fulcrum length of 300 mm (11.8 in.) and a union nut wrench with a fulcrum length of 22 mm (0.886 in.) (Click here).
This torque value is effective when union nut wrench is parallel to a torque wrench.
11.
CONNECT CLUTCH RESERVOIR TUBE
12.
BLEED CLUTCH PIPE LINE
13.
INSPECT AND ADJUST CLUTCH PEDAL SUB-ASSEMBLY
Pull back the floor carpet.
Check that the pedal height is correct.
Pedal height from asphalt sheet:
183.5 to 193.5 mm (7.224 to 7.618 in.)
Adjust the pedal height.
Loosen the lock nut and turn the clutch switch until the height is correct. Tighten the lock nut.
Torque:
15 N*m{
153 kgf*cm
, 11 ft.*lbf
}
Check that the pedal free play and push rod play are correct.
Depress the pedal until the clutch resistance begins to be felt.
Pedal free play:
5.0 to 15.0 mm (0.197 to 0.591 in.)
Gently depress the pedal until the resistance begins to increase a little.
Push rod play at pedal top:
1.0 to 5.0 mm (0.039 to 0.197 in.)
Adjust the pedal free play and push rod play.
Loosen the lock nut and turn the push rod until the free play and push rod play are correct.
Tighten the lock nut.
After adjusting the pedal free play, check the pedal height.
Connect the air duct and install the lower finish panel.
Check the clutch release point.
Pull the parking brake lever and chock the wheels.
Start the engine and allow it to idle.
Without depressing the clutch pedal, slowly move the shift lever into the reverse position until the gears engage.
Gradually depress the clutch pedal and measure the stroke distance from the point that the gear noise stops (release point) up to the full stroke end position.
Standard distance:
25 mm (0.984 in.) or more
(From pedal stroke end position to release point)
If the distance is not as specified, perform the following operations.
Check the pedal height.
Check the push rod play and pedal free play.
Bleed the clutch line.
Check the clutch cover assembly and disc assembly.