2011-2016 FJ Cruiser · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Jul 2007 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014


1. INSTALL CLUTCH ACCUMULATOR ASSEMBLY
  1. Install the clutch accumulator assembly with the 3 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }

  1. Temporarily tighten the flexible hose tube to the clutch accumulator assembly.

  1. Install the clutch line bracket with the nut.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Using a union nut wrench, fully tighten the flexible hose tube.

    Torque:
    for M10 flare nut:
    15 N*m{ 155 kgf*cm , 11 ft.*lbf }
    for M12 flare nut:
    20 N*m{ 199 kgf*cm , 14 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Temporarily install the clutch release tube to the clutch accumulator assembly.

  1. Install the clutch line bracket with the bolt.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }

  1. Using a union nut wrench, fully tighten the clutch release tube.

    Torque:
    15 N*m{ 155 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).


2. INSTALL NO. 1 CLUTCH HOUSING COVER
  1. Install the No. 1 clutch housing cover with the 3 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }


3. INSTALL NO. 2 MANIFOLD STAY
  1. Install the No. 2 manifold stay to the exhaust manifold sub-assembly LH with the 3 bolts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }


4. INSTALL NO. 2 EXHAUST FRONT PIPE ASSEMBLY
  1. Install a new gasket to the exhaust manifold sub-assembly LH.

  1. Install a new gasket to the front No. 2 exhaust pipe assembly.

  1. A129938
    Install the front No. 2 exhaust pipe assembly with 2 new nuts, 2 bolts and exhaust pipe support.

    Torque:
    Nut:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }
    Bolt:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }


5. BLEED CLUTCH PIPE LINE
  1. Fill the brake reservoir tank with the brake fluid and bleed the clutch system.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }


6. INSPECT FOR CLUTCH FLUID LEAK

7. INSPECT FOR FLUID LEVEL IN RESERVOIR
← INSTALLATION (Nov 2010 – Jul 2014)COMPONENTS (from Jul 2007) →