2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Remove the 4 bolts, then remove the No. 1 engine under cover.


2. REMOVE FAN & GENERATOR V BELT

A076441E01
  1. While releasing the belt tension by turning the belt tensioner counterclockwise, remove the V-ribbed belt from the belt tensioner.

← ON-VEHICLE INSPECTION (from Aug 2009)REMOVAL (from Aug 2009) →