2011-2016 FJ Cruiser · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built Jul 2007 – Jul 2009

Versions by build date: Jul 2007 – Jul 2009 from Aug 2009


1. INSTALL OIL PUMP RELIEF VALVE
  1. Coat the relief valve with engine oil and insert the relief valve and spring into the valve hole.

  1. Install the relief valve plug.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }


2. INSTALL OIL PUMP COVER

A072934E05
  1. Apply fresh engine oil to the drive and driven rotors.

  1. Place the drive and driven rotors into the timing chain cover with the marks facing the oil pump cover side.

  1. A072932E01
    Install the oil pump cover with the 7 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install a new O-ring onto the oil pump cover.

  1. Install a new O-ring onto the oil pipe.

  1. A072931E01
    Install the oil pipe with the 3 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

← INSPECTION (from Aug 2009)REASSEMBLY (from Aug 2009) →