INSTALLATION
Removal / installation · Vehicles built from Nov 2010
Versions by build date: Jul 2007 – Oct 2010 from Nov 2010
| 1. INSTALL HEADLIGHT LEVELING SWITCH (for LHD) |
Connect the connector.

Engage the 2 claws and install the headlight leveling switch.
| 2. INSTALL HEADLIGHT LEVELING SWITCH (for RHD) |
Connect the connector.
Engage the 2 claws and install the headlight leveling switch.
| 3. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY |
Engage the 4 clips and 2 claws and install the instrument panel register.
