INSTALLATION
Removal / installation · Vehicles built Jul 2007 – Oct 2010
Versions by build date: Jul 2007 – Oct 2010 from Nov 2010
| 1.
INSTALL LIGHT CONTROL RHEOSTAT |
 |
Engage the 2 claws and install the light control rheostat.
Connect the connector.
| 2.
INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY
|
 |
- Engage the 4 clips and 2 claws and install the instrument panel register.
| 3.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
-
Torque:
- 3.9 N*m{
40 kgf*cm
, 35 in.*lbf
}