2011-2016 FJ Cruiser · Service Manual BODY ELECTRICAL

INSTALLATION

Removal / installation · Vehicles built from Nov 2010

Versions by build date: Jul 2007 – Oct 2010 from Nov 2010


1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY

B133888
  1. Engage the 4 clips and install the integration control and panel.

  1. Install the 2 screws.


2. INSTALL INSTRUMENT PANEL GARNISH LH
  1. Engage the 3 clips and install the instrument panel garnish.

  1. Install the screw <G>.


3. INSTALL INSTRUMENT PANEL GARNISH RH
  1. Engage the 3 clips and install the instrument panel garnish.

  1. Install the screw <G>.


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }

← INSTALLATION (Jul 2007 – Oct 2010)COMPONENTS (Jul 2007 – Oct 2010) →