2011-2016 FJ Cruiser · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2009 – Oct 2010 Nov 2010 – Jul 2014 from Aug 2014


1. REMOVE FRONT FENDER APRON SEAL RH

  1. A223336
    Remove the 4 clips and front fender apron seal RH from the front fender apron sub-assembly RH.


2. REMOVE ENGINE OIL PRESSURE SWITCH ASSEMBLY

A222098
  1. Disconnect the oil pressure switch connector.

  1. Using a 24 mm deep socket wrench, remove the oil pressure switch.

← REMOVAL (Nov 2010 – Jul 2014)INSPECTION (from Aug 2009) →