AIR CONDITIONING PANEL > INSTALLATION |
| 1. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY |
![]() |
Connect the 3 connectors.
Engage the 4 clips and install the integration control assembly.
Install the 2 screws.
| 2. INSTALL INSTRUMENT PANEL GARNISH LH |
![]() |
Engage the 3 clips and install the instrument panel garnish.
Install 2 <H> screws.
| 3. INSTALL INSTRUMENT PANEL GARNISH RH |
![]() |
Engage the 3 clips and install the instrument panel garnish.
Install screw <H>.
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |