Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › BLOWER UNIT

BLOWER UNIT > INSPECTION

for Preparation Click here



1. INSPECT AIR INLET CONTROL SERVO MOTOR


    I102499E01
  1. Inspect the servo motor operation.

    1. Connect the positive (+) lead from the battery to terminal 5 (IG+) and negative (-) lead to terminal 1 (FRS), then check that the lever turns to the FRESH side smoothly.

      Standard:
      The motor operates smoothly.

      If the operations are not as specified, replace the air inlet control servo motor.

    2. Connect the positive (+) lead from the battery to terminal 5 (IG+) and negative (-) lead to terminal 2 (REC), then check that the lever turns to the RECIRCULATION side smoothly.

      Standard:
      The motor operates smoothly.

      If the operations are not as specified, replace the air inlet control servo motor.