Home › TRANSMISSION ยท A750E AUTOMATIC TRANSMISSION › FLOOR SHIFT ASSEMBLY

FLOOR SHIFT ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL SHIFT LEVER ASSEMBLY


C129555
  1. Install the shift lever with the 4 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Connect the indicator light connector.

  1. Connect the shift lock control computer connector.



2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY


C129554
  1. Connect the control cable with the lock clip.



3. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY


    B133897
  1. Engage the 3 claws and 5 clips and install the console upper rear panel.



4. INSTALL PARKING BRAKE HOLE COVER SUB-ASSEMBLY


B133901E01
  1. Slide the parking brake hole cover toward the rear of the vehicle and engage the 2 C claws.

  1. Engage the 4 claws and install the parking brake hole cover.



5. INSPECT SHIFT LEVER POSITION
  1. Check that the shift lever moves smoothly and appropriately from the P to the R position, only when the ignition switch is turned to ON and the brake pedal is depressed.

  1. When starting the engine, make sure that the vehicle moves forward when shifting the lever from the N to the D position and moves rearward when shifting the lever to the R position.



6. ADJUST SHIFT LEVER POSITION


    D028682E07
  1. Push the control shaft fully rearward.
    Text in Illustration 
    *a
    N Position

  1. Turn the control shaft lever 2 notches counterclockwise to the N position.

  1. Set the shift lever to the N position.