Home › BODY ELECTRICAL › METER › LIGHT CONTROL RHEOSTAT

LIGHT CONTROL RHEOSTAT > INSTALLATION

for Preparation Click here



1. INSTALL LIGHT CONTROL RHEOSTAT


E127936
  1. Engage the 2 claws and install the light control rheostat.

  1. Connect the connector.



2. INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY


    B133853
  1. Engage the 4 clips and 2 claws and install the instrument panel register.



3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }