Home › BODY ELECTRICAL › OTHER SYSTEM › CLOCK

CLOCK > INSTALLATION

for Preparation Click here



1. INSTALL CLOCK ASSEMBLY


    E129650
  1. Engage the 2 claws and install the clock assembly.

    HINT:
    Push the clock assembly in the direction shown in the illustration, to install it.



2. INSTALL RADIO RECEIVER ASSEMBLY


    E221532
  1. Connect the connectors.

  1. Align the 2 bosses of the radio bracket with the hole in the instrument panel and install the radio receiver with the 4 bolts.

    Torque:
    2.5 N*m{ 25 kgf*cm , 22 in.*lbf }



3. INSTALL INTEGRATION CONTROL PANEL ASSEMBLY


B133888
  1. Connect the 3 connectors.

  1. Engage the 4 clips and install the integration control panel assembly.

  1. Install the 2 <H> screws.



4. INSTALL INSTRUMENT PANEL GARNISH RH


    B133887
  1. Engage the 3 clips and install the instrument panel garnish.

  1. Install screw <H>.



5. INSTALL INSTRUMENT PANEL GARNISH LH


    B133886
  1. Engage the 3 clips and install the instrument panel garnish.

  1. Install 2 <H> screws.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }