CLOCK > INSTALLATION |
| 1. INSTALL CLOCK ASSEMBLY |
![]() |
Engage the 2 claws and install the clock assembly.
| 2. INSTALL RADIO RECEIVER ASSEMBLY |
![]() |
Connect the connectors.
Align the 2 bosses of the radio bracket with the hole in the instrument panel and install the radio receiver with the 4 bolts.
| 3. INSTALL INTEGRATION CONTROL PANEL ASSEMBLY |
![]() |
Connect the 3 connectors.
Engage the 4 clips and install the integration control panel assembly.
Install the 2 <H> screws.
| 4. INSTALL INSTRUMENT PANEL GARNISH RH |
![]() |
Engage the 3 clips and install the instrument panel garnish.
Install screw <H>.
| 5. INSTALL INSTRUMENT PANEL GARNISH LH |
![]() |
Engage the 3 clips and install the instrument panel garnish.
Install 2 <H> screws.
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |