Home › ENGINE › 1GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the No. 1 fuel vapor feed hose and fuel vapor feed hose.

  1. Connect the purge VSV connector.



2. INSTALL V-BANK COVER
  1. Engage the 2 hooks and install the V-bank cover to the No. 1 V-bank cover bracket.

  1. Align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to engage the pins.