Home › ENGINE › 1GR-FE EMISSION CONTROL › PCV VALVE

PCV VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER


    A229925E02
  1. Raise the front of the V-bank cover to disengage the 2 pins.
    Text in Illustration 
    *1
    Pin
    *2
    Hook
    *3
    No. 1 V-bank Cover Bracket

  1. Disengage the 2 hooks and remove the V-bank cover from the No. 1 V-bank cover bracket.



2. DISCONNECT HEATER HOSE


    A223557
  1. Disconnect the heater hose clamp.



3. REMOVE VENTILATION VALVE SUB-ASSEMBLY


    A223558
  1. Disconnect the ventilation hose from the ventilation valve.



    A223559
  1. Remove the ventilation valve.