Home › ENGINE › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER


    A229925E02
  1. Raise the front of the V-bank cover to disengage the 2 pins.
    Text in Illustration 
    *1
    Pin
    *2
    Hook
    *3
    No. 1 V-bank Cover Bracket

  1. Disengage the 2 hooks and remove the V-bank cover from the No. 1 V-bank cover bracket.



2. REMOVE AIR CLEANER CAP SUB-ASSEMBLY AND AIR CLEANER HOSE ASSEMBLY


    A227193
  1. Disconnect the MAF meter connector.

  1. Disengage the 4 wire harness clamps.

  1. Disconnect the ventilation hose and vacuum hose.

  1. Remove the bolt.

  1. Loosen the No. 1 air cleaner hose clamp.

  1. Release the 4 hinges.

  1. Remove the air cleaner cap and hose.



3. REMOVE AIR CLEANER CASE SUB-ASSEMBLY
  1. Remove the air cleaner filter element from the air cleaner case sub-assembly.



    A224715
  1. Disengage the wire harness clamp and separate the wire harness from the air cleaner case sub-assembly.

  1. Remove the 3 bolts and the air cleaner case sub-assembly from the engine room compartment.



4. REMOVE AIR TUBE


    A288091
  1. Remove the 2 bolts, 2 nuts and the air tube from the emission control valve set and exhaust manifold sub-assembly RH.

  1. Remove the 2 gaskets from the air tube.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



5. REMOVE EMISSION CONTROL VALVE SET


    A223568
  1. Disconnect the emission control valve set connector.

  1. Loosen the hose clamp and disconnect the air hose assembly from the emission control valve set.



    A223570
  1. Remove the 3 nuts and the emission control valve set from the cylinder head cover sub-assembly.