Home › ENGINE ยท 2KD-FTV › STARTING › STARTER (for 2.0 kW Type)

STARTER (for 2.0 kW Type) > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A115883E01
  1. Install the starter with the bolt and 2 nuts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }



    A115882E01
  1. Connect the wire harness to terminal 30 and install the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.

  1. Connect the terminal 50 connector to the starter assembly.



    A113410E01
  1. Install the ground cable with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



2. INSTALL TRANSMISSION CONTROL CABLE BRACKET NO.1 (for Automatic Transmission)


    C101783
  1. Install the transmission control cable bracket No.1 to the automatic transmission assembly with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



3. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)


    C101771E02
  1. Fix the transmission control cable assembly to the control cable bracket with a clip.

  1. Install the transmission control cable assembly to the control shaft lever with the nut.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }



4. INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



5. INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



6. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



7. CONNECT NEGATIVE BATTERY CABLE


8. PERFORM INITIALIZATION
  1. Some system need initialization when reconnecting the battery cable. (Click here)