Home › ENGINE ยท 2TR-FE › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A113538E01
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Connect the wire harness to terminal 30 and install the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the terminal 50 connector to the starter assembly.



    A102709E01
  1. Install the ground cable and wire bracket with the 2 bolts.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



2. INSTALL TRANSMISSION CONTROL CABLE BRACKET NO.1 (for Automatic Transmission)


    C102931E03
  1. Install the transmission control cable bracket to the automatic transmission assembly with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 11 ft.*lbf }



3. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)


    C102933E04
  1. Install the transmission control cable assembly to the control shaft lever and transmission control bracket No.1 with the nut and a new clip.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }



4. INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



5. INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



6. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }



7. CONNECT NEGATIVE BATTERY CABLE


8. PERFORM INITIALIZATION
  1. Some system need initialization when reconnecting the battery cable. (Click here)