Home › ENGINE · 2KD-FTV › ENGINE CONTROL SYSTEM › ECD SYSTEM

ECD SYSTEM > Starter Signal Circuit

for Preparation Click here


DESCRIPTION

While the engine is being cranked, current flows from terminal ST2 of the ignition switch to the ST fuse and also flows to terminal STA of the ECM (STA signal).

WIRING DIAGRAM


A113689E01


INSPECTION PROCEDURE

NOTICE:
After replacing the ECM, the new ECM needs registration (Click here) and initialization (Click here).

HINT:
This chart is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table (Click here).

1.READ VALUE OF STARTER SIGNAL
  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch ON and turn the intelligent tester ON.

  1. Enter the following menus: Power train / ECD / Data List / Starter Signal.

  1. Read the values.

    Standard:

    Ignition Switch Position
    ON
    START
    Starter SIG
    OFF
    ON



OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG


2.CHECK HARNESS AND CONNECTOR (STARTER RELAY - ECM)


    A109139E01
  1. Disconnect the B9 ECM connector.

  1. Remove the ST relay from the engine room J/B and R/B No.1.

  1. Measure the resistance of the wire harness side connectors.

    Standard resistance:
    Tester Connection
    Specified Condition
    B9-7 (STA) - R/B ST relay terminal 1
    Below 1 Ω
    B9-7 (STA) or R/B ST relay terminal 1- Body ground
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS AND CONNECTOR
OK

REPLACE ECM