Home › ENGINE · 5L-E › ENGINE CONTROL SYSTEM › ECD SYSTEM

DTC    18    Spill Control Circuit Malfunction

for Preparation Click here


DESCRIPTION

The ECM controls the fuel injection volume by operating the spill control valve. The spill control valve is mounted on the injection pump, and opens or closes the injection pressure releasing port with the solenoid valve in the spill control valve. During injection, valve is close ON. The ECM decides the basic fuel injection volume by the engine rpm and accelerator pedal opening angle, and calculates the final fuel injection angle to add the various corrections on the basic fuel injection volume. The ECM counts the NE pulse to detect the angle from injection starts and operates the spill control valve from ON to OFF (the injection pressure releasing port is open) at the position which watches the final fuel injection angle.

A076134E01


DTC No.
DTC Detection Condition
Trouble Area
18
Open or short in spill control valve at 500 rpm or more
  1. Open or short in spill control valve circuit
  2. Spill control valve
  3. ECM

WIRING DIAGRAM


A110554E01


INSPECTION PROCEDURE

1.INSPECT SPILL CONTROL VALVE


    A105094E01
  1. Disconnect the spill control valve connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    1 - 2
    1 to 2 Ω (20°C (68°F))

    HINT:
    The spill control valve is integrated with the injection pump. If the spill control valve is replaced, the injection pump must be replaced in whole.



NG
REPLACE INJECTION PUMP ASSEMBLY
OK


2.INSPECT ECM


    A062416E03
  1. Disconnect the spill control valve connector.

  1. Turn the ignition switch ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Specified Condition
    SPV+ (D2-12) - E1 (D2-14)
    9 to 14 V



NG
REPLACE ECM
OK


3.INSPECT ECM


    A110527E01
  1. Turn the ignition switch ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Specified Condition
    SPV- (D2-25) - E1 (D2-14)
    9 to 14 V

  1. While idling, measure the waveform with oscilloscope between the specified terminals of ECM connector.

    OK:
    Tester Connection
    Specified Condition
    SPV- (D2-25) - E1 (D2-14)
    Correct waveform shown



NG
Go to step 4
OK

CHECK FOR INTERMITTENT PROBLEMS 

4.CHECK HARNESS AND CONNECTOR (ECM - SPILL CONTROL VALVE)


    A110528E01
  1. Disconnect the spill control valve connector.

  1. Disconnect the ECM D2 connector.

  1. Measure the resistance to the value(s) in the table below.

    Standard resistance (Check for open):
    Tester Connection
    Specified Condition
    SPV+ (D59-2) - SPV+ (D2-12)
    Below 1 Ω
    SPV- (D59-1) - SPV- (D2-25)
    Below 1 Ω

    Standard resistance (Check for short):
    Tester Connection
    Specified Condition
    SPV+ (D2-12) - Body ground
    10 kΩ or higher
    SPV- (D2-25) - Body ground
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM