Home › COMMUNICATION SYSTEM › CAN COMMUNICATION › CAN COMMUNICATION SYSTEM

CAN COMMUNICATION SYSTEM > Short to B+ in CAN Bus Line

for Preparation Click here


DESCRIPTION

A short to B+ is suspected in the CAN bus line when there is continuity between terminals 16 (BAT) and 6 (CANH) or terminals 16 (BAT) and 14 (CANL) of the DLC3.

Symptom
Trouble Area
There is continuity between terminals 16 (BAT) and 6 (CANH) or 16 (BAT) and 14 (CANL) of the DLC3.
  1. Short to B+ in CAN bus line
  2. ECM
  3. Air conditioning complifier

WIRING DIAGRAM


C107870E01


INSPECTION PROCEDURE

1.CHECK CAN BUS LINE FOR SHORT TO B+ (DLC3 SUB BUS LINE)


    G031933E05
  1. Disconnect the DLC3 sub bus line connector (H5) from the CAN J/C.

    NOTICE:
    1. Before disconnecting the connector, make a note of where it is connected.
    2. Reconnect the connector to its original position.



    G026206E22
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester connection
    Condition
    Specified value
    H23-16 (BAT) - H23-6 (CANH)
    IG switch OFF
    1 MΩ or higher
    H23-16 (BAT) -
    H23-14 (CANL)
    IG switch OFF
    1 MΩ or higher

    HINT:
    1. NG-A: Resistance between terminals BAT and CANH is less than 1 MΩ.
    2. NG-B: Resistance between terminals BAT and CANL is less than 1 MΩ.



NG-A
REPAIR OR REPLACE DLC3 SUB BUS LINE OR CONNECTOR (CAN-H)

NG-B
REPAIR OR REPLACE DLC3 SUB BUS LINE OR CONNECTOR (CAN-L)
OK


2.CONNECT CONNECTOR
  1. Reconnect the DLC3 sub bus line connector (H5) to the CAN J/C.


NEXT


3.CHECK CAN BUS LINE FOR SHORT TO B+ (AIR CONDITIONING AMPLIFIER SUB BUS LINE)


    G031933E07
  1. Disconnect the air conditioning amplifier sub bus line connector (H3) from the CAN J/C.

    NOTICE:
    1. Before disconnecting the connector, make a note of where it is connected.
    2. Reconnect the connector to its original position.



    G026206E22
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester connection
    Condition
    Specified value
    H23-16 (BAT) - H23-6 (CANH)
    IG switch OFF
    1 MΩ or higher
    H23-16 (BAT) -
    H23-14 (CANL)
    IG switch OFF
    1 MΩ or higher



OK
Go to step 6
NG


4.CONNECT CONNECTOR
  1. Reconnect the air conditioning amplifier sub bus line connector (H3) to the CAN J/C.


NEXT


5.CHECK CAN BUS LINE FOR SHORT TO B+ (ECM MAIN BUS LINE)


    G031933E08
  1. Disconnect the ECM main bus line connector (H4) from the CAN J/C.

    NOTICE:
    1. Before disconnecting the connector, make a note of where it is connected.
    2. Reconnect the connector to its original position.



    C107873E02
  1. Disconnect the ECM connectors (B7) and (B9). (2TR-FE)

  1. Disconnect the ECM connector (B7). (2KD-FTV)

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    2TR-FE:
    Tester connection
    Condition
    Specified value
    B7-33 (CANH) - B9-3 (BATT)
    IG switch OFF
    1 MΩ or higher
    B7-34 (CANL) - B9-3 (BATT)
    IG switch OFF
    1 MΩ or higher
    2KD-FTV:
    Tester connection
    Condition
    Specified value
    B7-24 (CANH) - B7-2 (BATT)
    IG switch OFF
    1 MΩ or higher
    B7-23 (CANL) - B7-2 (BATT)
    IG switch OFF
    1 MΩ or higher

    HINT:
    1. NG-A: Resistance between terminals BATT and CANH is less than 1 MΩ.
    2. NG-B: Resistance between terminals BATT and CANL is less than 1 MΩ.



NG-A
REPAIR OR REPLACE ECM MAIN BUS LINE OR CONNECTOR (CAN-H)

NG-B
REPAIR OR REPLACE ECM MAIN BUS LINE OR CONNECTOR (CAN-L)
OK

REPLACE ECM 

6.CHECK CAN BUS LINE FOR SHORT TO B+ (AIR CONDITIONING AMPLIFIER SUB BUS LINE)


    C107863E07
  1. Disconnect the air conditioning amplifier (H18).

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester connection
    Condition
    Specified value
    H18-10 (CANH) - H18-40 (B)
    IG switch OFF
    1 MΩ or higher
    H18-11 (CANL) - H18-40 (B)
    IG switch OFF
    1 MΩ or higher

    HINT:
    1. Check the air conditioning amplifier sub bus line line connector (H3) while disconnected from the CAN J/C.
    2. NG-A: Resistance between terminals B and CANH is less than 1 MΩ.
    3. NG-B: Resistance between terminals B and CANL is less than 1 MΩ.



NG-A
REPAIR OR REPLACE AIR CONDITIONING AMPLIFIER SUB BUS LINE OR CONNECTOR (CAN-H)

NG-B
REPAIR OR REPLACE AIR CONDITIONING AMPLIFIER SUB BUS LINE OR CONNECTOR (CAN-L)
OK

REPLACE AIR CONDITIONING AMPLIFIER