Home › ENGINE ยท 2TR-FE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A099545E02
  1. Install the valve with the 2 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the connector.



2. INSTALL INTAKE PIPE NO.4


    A099544E02
  1. Install 2 new gaskets and the pipe with the 4 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Check that the nuts are tightened to the torque specification.

    NOTICE:
    Tightening the nuts only once is not enough to tighten them to the torque specification.



3. INSTALL EXHAUST MANIFOLD HEAT INSULATOR NO.1


    A113523
  1. Install the heat insulator with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



4. INSTALL AIR PUMP INLET PIPE


    A113521E01
  1. Install the air pump inlet pipe with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Connect the air hose No.6 with the clip.



5. CONNECT AIR HOSE NO.5


    A113518E01
  1. Connect the air hose No.5 to the air pump inlet pipe with the clip.



6. INSTALL BATTERY SERVICE HOLE COVER


7. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Roll up the carpet, and remove the 5 bolts and engine service hole sub cover.



8. INSTALL FRONT DOOR SCUFF PLATE RH


9. REMOVE FRONT SEAT ASSEMBLY RH (for Hi-back Seat Type)
  1. Perform the same procedure as above on the opposite side.



10. INSTALL FRONT SEAT ASSEMBLY RH (for Low-back Seat Type)
  1. Perform the same procedure as above on the opposite side.



11. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)
  1. Install the engine under cover No.2 together with the engine side under cover LH and engine side under cover RH (for Wide Body).



12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


13. REMOVE PERFORM INITIALIZATION
(Click here)