Home › ENGINE ยท 2TR-FE › EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CHARCOAL CANISTER ASSEMBLY
  1. Install the bracket to the charcoal canister.



    A114747
  1. Connect the 2 fuel vapor feed hoses.



2. INSTALL BATTERY CARRIER
  1. Install the battery carrier with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



3. INSTALL BATTERY


4. PERFORM INITIALIZATION