Home › ENGINE ยท 2TR-FE › EMISSION CONTROL › DUTY VACUUM SWITCHING VALVE (for EVAP)

DUTY VACUUM SWITCHING VALVE (for EVAP) > INSTALLATION

for Preparation Click here



1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY NO.1 (EVAP VSV)
  1. Install the vacuum switching valve assembly No.1 with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



    A114748
  1. Connect the fuel vapor feed hose No.2 and the duty vacuum switching valve connector.

  1. Connect the fuel vapor feed hose.