DUTY VACUUM SWITCHING VALVE (for EVAP) > INSPECTION |
| 1. INSPECT VACUUM SWITCHING VALVE ASSEMBLY NO.1 (EVAP VSV) |
Check the resistance.
![]() |
Using an ohmmeter, measure the resistance between the terminals.
| Tester Connection | Specified Condition |
| 1 - 2 | 26 to 30Ω at 20°C (68°F) |
Check the vacuum switching valve No.1 for ground.
Using an ohmmeter, check the resistance between each terminal and the body.
| Tester Connection | Specified Condition |
| 1 - Body | 10 MΩ or higher |
| 2 - Body | 10 MΩ or higher |
Check the operation.
![]() |
Check that air does not flow from port E to port F.
If the operation is not as specified, replace the vacuum switching valve assembly No.1.
![]() |
Apply battery voltage across the terminals.
Check that air flows from port E to port F.
If the operation is not as specified, replace the vacuum switching valve assembly No.1.