Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › REAR COOLING UNIT

REAR COOLING UNIT > REMOVAL

for Preparation Click here



1. REMOVE ROOF NO.1 HEADLINING (for Semi-trim)

HINT:
Refer to the instruction for removal of the roof headlining.



2. REMOVE ROOF NO.1 HEADLINING (for Full-trim)

HINT:
Refer to the instruction for removal of the roof headlining. (Middle Roof Type: Click hereHigh Roof Type: Click here)



3. DISCONNECT COOLER UNIT NO.2 DRAIN HOSE


    E104210E01
  1. Remove the cooler unit No.2 drain hose.



4. DISCONNECT COOLER UNIT NO.3 DRAIN HOSE
  1. Remove the cooler unit No.3 drain hose.



5. REMOVE COOLER REFRIGERANT HOSE NO.1 INSULATOR


    E104211
  1. Remove the cooler refrigerant hose No.1 insulator.



6. REMOVE AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY


    E104212
  1. Remove the 2 bolts and air conditioning tube and accessory assembly.



7. REMOVE REAR COOLING UNIT


    E104213
  1. Disconnect the connector.

  1. Remove the 5 bolts and rear cooling unit.