Home › STEERING › POWER STEERING › VANE PUMP (for 2TR-FE)

VANE PUMP (for 2TR-FE) > INSTALLATION

for Preparation Click here



1. INSTALL VANE PUMP ASSEMBLY


    C101369
  1. Install the vane pump assembly with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }



    C101368E01
  1. Connect the oil pressure switch connector.



2. CONNECT PRESSURE FEED TUBE ASSEMBLY
  1. Install a new gasket to the pressure feed tube assembly.



    C101367E01
  1. Connect the pressure feed tube assembly (pressure feed tube side) to the vane pump assembly with the union bolt.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

    HINT:
    Make sure the stopper of the pressure feed tube assembly contacts the vane pump body as shown in the illustration.



    C101366E01
  1. Connect the pressure feed tube assembly (return tube side) to the vane pump assembly with the clip.



3. INSTALL FAN AND GENERATOR V BELT


G035171E02
  1. Install the drive belt to the pulleys except the drive belt tensioner pulley.

  1. Use the hexagon-shaped part indicated by the arrow in the illustration to move the tensioner pulley downward and then install the drive belt to the tensioner pulley.

    NOTICE:
    1. The backside of the drive belt should face the tensioner pulley.
    2. Check that the drive belt is properly set to each pulley.



    G036496E02
  1. After a new belt has been installed, check that the tensioner indicator mark is within range A shown in the illustration.



4. ADD POWER STEERING FLUID


5. BLEED POWER STEERING FLUID



6. CHECK FOR POWER STEERING FLUID LEAKS