DIRECT CLUTCH > INSPECTION |
| 1. INSPECT PACK CLEARANCE OF DIRECT CLUTCH |
![]() |
Place the direct clutch assembly onto the O/D support assembly.
![]() |
Using SST and a dial indicator, measure the direct clutch pack clearance while applying and releasing compressed air (186 to 206 kPa, 1.9 to 2.1 kgf/cm2, 27 to 30 psi).
| 2. INSPECT DIRECT CLUTCH FLANGE |
![]() |
Check to see if the sliding surface of the disc, the plate and the flange are worn or burnt. If necessary, replace them.
| 3. INSPECT DIRECT CLUTCH RETURN SPRING SUB-ASSEMBLY |
![]() |
Measure the free length of the spring together with the spring seat.
| 4. INSPECT DIRECT CLUTCH PISTON SUB-ASSEMBLY |
![]() |
Check that the check ball is free by shaking the piston.
Check that the valve does not have leaks by applying low-pressure compressed air.
| 5. INSPECT DIRECT CLUTCH DRUM SUB-ASSEMBLY |
![]() |
Using a deal indicator, measure the inside diameter of the clutch drum bushing.
| 6. INSPECT PACK CLEARANCE OF DIRECT CLUTCH |
![]() |
Place the direct clutch assembly onto the O/D support assembly.
![]() |
Using SST and a dial indicator, measure the direct clutch piston stroke while applying and releasing compressed air (392 kPa, 4.0 kgf/cm2, 57 psi).
| No. | Thickness | No. | Thickness |
| 53 | 3.3 (0.130) | 57 | 3.7 (0.146) |
| 54 | 3.4 (0.134) | 58 | 3.8 (0.150) |
| 55 | 3.5 (0.138) | 60 | 4.0 (0.157) |
| 56 | 3.6 (0.142) | 62 | 4.2 (0.165) |