Home › ENGINE ยท 2KD-FTV › ENGINE CONTROL SYSTEM › DIESEL THROTTLE BODY

DIESEL THROTTLE BODY > INSTALLATION

for Preparation Click here



1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

NOTICE:
After removing and installing, or replacing the throttle body, be sure to perform the operation check.

  1. Install a new gasket to intake air connector.



    A102902
  1. Install the throttle body with the 2 bolts and the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    A102282
  1. Connect the 2 throttle body connectors.



2. INSTALL AIR HOSE NO.4


    A102281
  1. Install the air hose No.4 with the 2 clamps.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



3. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)


    A106845
  1. Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.



    A106844
  1. Install the EGR pipe with the 2 bolts and the 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



    A106043
  1. Connect the fuel pressure sensor connector.



4. CONNECT OIL RETURN HOSE (w/ Intercooler)


    A106042
  1. Connect the oil return hose with the clip.



5. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY


    A102278
  1. Install the vane pump oil reservoir assembly with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



6. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }