CAMSHAFT > INSPECTION |
| 1. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY |
![]() |
Put the camshaft timing gear and camshaft together by aligning the key groove and straight pin.
Lightly press the gear against the camshaft, and turn the gear. Push further at the position where the pin enters the groove.
Check that there is no clearance between the gear's flange and the camshaft.
Tighten the flange bolt with the camshaft timing gear fixed.
Check that the camshaft timing gear assembly can move in the retard direction (the right angle), and is locked at the most retarded position.
| 2. INSPECT CAMSHAFT TIMING GEAR ASSEMBLY |
![]() |
Check the lock of the camshaft timing gear.
Clamp the camshaft in a vise, and confirm that the camshaft timing gear is locked.
Release the lock pin.
Cover the 4 oil paths of the cam journal with vinyl tape as shown in the illustration.
![]() |
Break through the tape of the advance side path and the retard side path on the opposite side to the hole of the advance side path.
Apply approximately 200 kPa (2.0 kgf/cm2, 28 psi) of air pressure to the two broken paths.
![]() |
Check that the camshaft timing gear revolves in the advance direction when reducing the air pressure applied to the retard side path.
When the camshaft timing gear reaches the most advanced position, release the air pressure from the retard side path and advance side path, in that order.
Check for smooth rotation.
Rotate the camshaft timing gear within its movable range several times, but do not turn it to the most retarded position. Check that the gear rotates smoothly.
Check the lock in the most retarded position.
Confirm that the camshaft timing gear is locked at the most retarded position.
| 3. REMOVE CAMSHAFT TIMING GEAR ASSEMBLY |
Check that the camshaft timing gear assembly does not turn by mounting the hexagon wrench head portion of the camshaft in a vise through aluminium metal cap and so on.
![]() |
Remove the flange bolt and camshaft timing gear.