Home › ENGINE ยท 2KD-FTV › ENGINE CONTROL SYSTEM › INTEGRATION RELAY

INTEGRATION RELAY > INSTALLATION

for Preparation Click here



1. INSTALL INTEGRATION RELAY
  1. Connect the 3 connectors.

  1. Install the integration relay to the engine room No.2 junction block.

  1. Install the engine room junction block cover.



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


3. PERFORM INITIALIZATION
(Click here)