Home › ENGINE ยท 5L-E › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL VACUUM PUMP ASSEMBLY
  1. Align the matchmarks and install the vacuum pump assembly with the 4 bolts.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }



2. INSTALL GENERATOR W/ VACUUM PUMP ASSEMBLY


    A113355
  1. Temporarily install the generator with the bolt (lower side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

  1. Connect the vacuum pump oil inlet hose with a new gasket and the union bolt.

    Torque:
    14 N*m{ 140 kgf*cm , 10 ft.*lbf }

  1. Connect the oil outlet hose.

  1. Connect the vacuum hose.



    A113536
  1. Connect the connector.

  1. Connect the +B terminal wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cover.



3. INSTALL COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning)
  1. Temporarily install the compressor mounting bracket with the 3 bolts.



    A112014
  1. Using several steps, uniformly install and tighten the 3 bolts in the sequence order is as shown in the illustration.

    Torque:
    47 N*m{ 475 kgf*cm , 36 ft.*lbf }



4. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning)


5. INSTALL FAN AND GENERATOR V BELT (w/ Air Conditioning)


6. INSTALL FAN AND GENERATOR V BELT (w/o Air Conditioning)


7. INSTALL V (COOLER COMPRESSOR TO CRANKSHAFT PULLEY) BELT NO.1 (w/ Air Conditioning)


8. INSTALL VANE PUMP V BELT


9. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY


10. INSTALL WIRE HARNESS SUPPORT


11. INSTALL FRONT DOOR SCUFF PLATE RH


12. INSTALL FRONT SEAT ASSEMBLY RH