INPUT SHAFT > REASSEMBLY |
| 1. INSTALL INPUT SHAFT FRONT BEARING |
![]() |
Using SST and a press, press in a new input shaft front bearing.
![]() |
Select a snap ring that will allow minimum amount of axial play.
| Mark | Thickness: mm (in.) |
| 0 | 2.05 to 2.10 (0.0807 to 0.0827) |
| 1 | 2.10 to 2.15 (0.0827 to 0.0847) |
| 2 | 2.15 to 2.20 (0.0847 to 0.0866) |
| 3 | 2.20 to 2.25 (0.0866 to 0.0886) |
| 4 | 2.25 to 2.30 (0.0886 to 0.0906) |
| 5 | 2.30 to 2.35 (0.0906 to 0.0925) |
![]() |
Using a snap ring expander, install the snap ring.
| 2. INSTALL INPUT SHAFT BEARING |
![]() |
Coat the 13 input shaft bearings with MP grease, install them to the input shaft.
| 3. INSTALL SYNCHRONIZER RING NO.2 |
![]() |
Coat the synchronizer ring No.2 with gear oil, and install it to the input shaft.